← Back to selected work

ZAN-E-LEC · Giving You Power

Our Work.

Selected photos of excavation, civil works, electrical, air conditioning and maintenance.

01—07

Thomson RdCivil · Underground services

Civil works in progress.

A published update describes civil works for multiple underground services at the Thomson Rd project.

StormwaterDrainage

Drainage and a rock pit.

The published caption describes extended stormwater drains and a rock pit intended to help limit erosion at a bank.

GoldsboroughUnderground · Meter board

Underground connection.

A post describes 65 m underground, a 2 m property pole and meter board, ready for Ergon connection.

Under-slabResidential work

Under-slab work.

A supplied project post documents under-slab works at two residential builds alongside planned air conditioning.

ElectricalCut-out · Rough-in

Electrical cut-out.

The post describes the cut-out stage following rough-in, with light fittings, switches and outlets measured and positioned.

Air conditioningInstallation · Maintenance

Air conditioning.

ZAN-E-LEC lists air conditioning installation and maintenance among its services. This photo shows exterior air conditioning units.

MaintenanceProperty pole rust repair

Property pole repair.

A published post describes rust being ground back and treated with bitumen sealant, followed by a new concrete collar.

Planning some work?

Let’s talk through it.

Request a quote